First of all, this project consists of tiger conservation and existing reserves along vegetation corridors. I began to work with three Data Frames that were given to me but needed to be aligned. The bottom data frame is the Overview frame, the data frame on the left is the Existing reserves frame (Bio), and the one on the right will be the Proposed reserves frame (Tiger). |
No comments:
Post a Comment